We run live fire demonstrations for architects, specifiers and facility teams, using our own assemblies and real ammunition at the exact UL 752 level you are considering.
Watch the round hit, inspect the panel afterward, and decide what goes in the spec.
Live fire · UL 752 assembly
Most manufacturers in this category sell a barrier. We build the opening it sits in.
Curtain WallsRated glazing carried across the facade→
StorefrontsEntrance systems that read as architecture→
DoorsSteel, wood, and aluminum with rated hardware→
WindowsFixed and operable, rated as full assemblies→
Transaction WindowsSpeak-thrus, deal trays, and voice ports→
PanelsOpaque ballistic infill for walls and millwork→
Four reasons architects and specification writers keep us in the drawings.
We are specified into the drawings and supply complete assemblies for public safety, transit, and civic buildings across the Northeast.
Newtown, Connecticut
New York, NY
Staten Island, NY
Queens, NYThere is a lot of bad information in this category, and some of it is sold by people with a financial interest in you believing it. These are written by the engineer who signs off on the assemblies.
Browse the technical library →
CSI 3-part specifications, CAD details, and UL 752 level guidance. Sent as one file, or downloaded page by page. No gate either way.
Straight answers to what specifiers and contractors ask most. Still working through a condition?
Talk to an engineer →Bulletproof is a marketing word, not an engineering one. No glazing or panel stops every projectile, and no manufacturer can honestly promise that it will. Bullet resistant is the accurate term: an assembly built to a tested makeup that stopped a defined cartridge, at a defined velocity, for a defined number of shots, with no penetration of the protected side.
UL 752 sets those conditions and sorts them into Levels 1 through 8. That is why a submittal that says bulletproof tells you nothing you can verify, while one that says tested to UL 752 Level 3 tells you exactly what was fired at it and what happened. Our bullet resistant glass page shows how the laminates are built up to reach a given level.
Start from the credible threat for the occupancy, not from a general preference for more protection. UL 752 is not a ladder where a bigger number is better against everything.
Threat profiles differ sharply by building type. Our industry pages break down what tends to drive the level in courthouses, pharmacies, schools, and other occupancies.
We manufacture. We do not install, and we do not sell installation labor. Assemblies are fabricated to the approved shop drawings and shipped to your glazing contractor or to the general contractor's installer.
That does not leave the installer on their own. Product specific installation instructions ship with the work, and we stay reachable through submittal, delivery, and field questions. If a condition on site does not match the detail, the time to call is before anything gets fastened, not after the opening is closed up. More on how we work with design and construction teams is on our about page.
Yes, and it is the quietest way a protected opening stops being one. The tested performance belongs to the whole assembly, not to the glass alone. Anchorage, fastener type and spacing, frame reinforcement, and glazing bite were all part of what was tested. Change them in the field and the opening no longer behaves the way the test did, while the submittal still reads at the specified level.
Conditions that commonly compromise an assembly:
We publish the documents rather than leave a contractor to work it out on site. See installation instructions for doors, windows, panels, glazing, and accessories.
Lead time depends on the assembly and on how fast approvals move, so we quote a date before you bid rather than after you win. A date you can build a schedule around is worth more than a short one that slips.
If a date is driving the job, say so up front and we will tell you honestly whether it works. Request a quote with the opening schedule and we will price the lead time with it.
Division 08 in most cases. Which section depends on the assembly, and a single package often carries several at once:
Ballistic panels are the exception. Depending on how the wall is drawn they are often carried with the wall assembly rather than in Division 08, and we can supply language either way.
Ask for them directly. There is no qualification call standing between you and a drawing, and you will not be handed to a salesperson to get a detail.
Send it through our contact page and it lands with a technical contact rather than in a sales queue.
Yes. We present continuing education for architects and design teams, in your office or remotely, and the hour is spent teaching rather than selling. Sessions cover:
To schedule a session for your office, start at our continuing education page.